🇬🇧 🇹🇷 🇩🇪 🇫🇷 🇪🇸 🇮🇹 🇸🇦 🇨🇳 🇯🇵 🇰🇷 🇮🇳 🇷🇺 🇺🇦 🇮🇱 🇮🇷 🇮🇩 🇲🇾 🇹🇭 🇻🇳
Schedule Demo

Validation Heritage

In defence deep-tech, claims are abundant. Validation is rare.

The difference between a defence deep-tech pitch deck and a qualified supplier is validation. Not laboratory demonstrations. Not simulation results. Real hardware, tested under operational conditions, witnessed by credible third parties.

Belvyon's technologies have achieved what most founders only promise:

  • 13 months of continuous operation aboard the International Space Station—the most hostile radiation environment accessible to human engineering
  • Live-fire ballistic testing against 14.5mm B32 API threats with Turkey's leading defence contractor
  • Selection from thousands of proposals across the NATO Alliance for the Defence Innovation Accelerator
  • Letters of Intent from 5th-generation fighter programmes

These are not future milestones. These are completed validations.

13

MONTHS
ISS Orbital Exposure

86.80%

BALLISTIC
Efficiency Achieved

STEP 3

NATO DIANA
Selection Stage

6+

GOVERNMENT
Grants Awarded

Validation Timeline

A decade of progressive validation from academic research to defence prime partnerships

2015

TÜBİTAK ARDEB 115R017 (1001-Class Grant)

Programme: Turkey's highest academic research funding tier

Project: "Development of Mechanical Performance of Multi-Scale Self-Healing Nanocomposite Radiation Shielding Material for Aerospace Applications"

Significance: Demonstrated founder capability to secure competitive government R&D funding at national premier level

2019

ISS/JAXA-Kibo Experiment Completion

Programme: JAXA Exposed Experiment Handrail Attachment Mechanism (ExHAM)

Experiment ID: 8071 | Duration: 13 months orbital exposure

Results: 11.1% gamma shielding improvement, 38.56% neutron enhancement

Significance: Ultimate de-risking signal—hardware survival in Van Allen Belt

View ISS/JAXA-Kibo Details

2019

APRSAF-26 International Presentation

Programme: Asia-Pacific Regional Space Agency Forum

Location: Nagoya Convention Hall, Japan (November 2019)

Significance: Presented alongside JAXA, NASA, KARI, TUA delegates—international peer recognition

2020

Roketsan Live-Fire Validation

Programme: Commercial ballistic testing contract | Value: $22,435.14 USD

Prototypes: 12 samples across T1, T2, T3 configurations

Test Standard: 14.5mm B32 API at 911 m/s (200m range)

Results: 86.80% ballistic efficiency (T2), 71.53% weight reduction vs standard ceramic

2020

SSB Defence Agency Letter of Intent

Programme: Turkish Secretariat of Defence Industries

Reference: Project 118303 | Date: 15 September 2020

Significance: Government defence agency pathway established for Turkish platform integration

2023

TÜBİTAK TEYDEB Project Completion

Programme: Technology and Innovation Grant Programme | Project ID: 7210093

Project: "Design, Optimisation, Production of Variable Radar Cross-Section Material for Radar-Invisible Fighter Canopy"

Final Evaluation: 09 August 2023 — COMPLETED

2024

TUSAS/TAI Letter of Intent

Programme: Turkish Aerospace Industries — KAAN Fighter Programme

Reference: E-V6600-045.99-76969 | Date: 6 March 2024

Scope: Radar absorbing canopy, EOTS, DAS, and infrared system windows

Significance: 5th-generation fighter programme qualification pathway

2025

NATO DIANA Step 3 Advancement

Programme: NATO Defence Innovation Accelerator for the North Atlantic

Challenge: "Contested Electromagnetic Environments"

Selection Date: 5 September 2025 | Status: STEP 3 (Final evaluation stage)

Significance: Selected from thousands of NATO Alliance proposals

2025

UK Incorporation

Company: Belvyon Limited | Company Number: 16762038

Registered: England and Wales (October 2025)

Significance: UK defence market access, ITAR-free export architecture, 37-nation OGEL pathway

The Ultimate De-Risking Signal

In the defence materials sector, Dr BEL's materials have achieved what most deep-tech founders only promise: 13 months of continuous operation in Low Earth Orbit at the outer zone of the Van Allen Belts—the most hostile radiation environment accessible to human engineering.

The ISS/JAXA-Kibo experiment validates not just material performance but manufacturing consistency. Space hardware must survive launch vibration, vacuum outgassing, thermal cycling (-150°C to +120°C), atomic oxygen fluence, and cosmic radiation flux.

Explore ISS/JAXA-Kibo Heritage

Live-Fire Tested

TOPSPOT hybrid armour underwent independent third-party validation through Roketsan A.S.—Turkey's premier defence contractor and a leading NATO supplier. The $22,435 contract delivered 12 prototype samples tested against 14.5mm B32 armour-piercing incendiary threats.

Results:

  • T2 Configuration: 3.3mm residual depth of penetration (86.80% efficiency)
  • Weight Advantage: 71.53% reduction vs standard ceramic
  • Confinement Effect: +18% efficiency gain with fabric wrap

Primary Source Documentation

All validation claims are substantiated by primary source documentation available in the investor data room

Validation Evidence Documentation
ISS/JAXA-Kibo Experiment JAXA official confirmation, APRSAF-26 proceedings, Wiley journal publication
NATO DIANA Step 3 Official notification email from challenges@diana.nato.int (5 Sept 2025)
TÜBİTAK TEYDEB Official completion certificate, project evaluation documents
Roketsan Contract Purchase Order 164872, bank payment verification (dekont), test reports
TUSAS/TAI LOI Official Letter of Intent (TASNIF DISI) Reference E-V6600-045.99-76969
UK Incorporation Companies House certificate, Company No. 16762038

Request Due Diligence Documentation

Accredited investors and strategic partners can request access to primary source validation documentation through our investor relations team.

Request Data Room Access View ISS Heritage Details